Installation and commissioning

Scale installation and system commissioning

Plan the equipment, site work, installation, and startup before the first load. We define the weighing scope and coordinate the next steps with your team.

Looking for what we automate, from hoppers to unattended weighing? See Automation.

A loader positioning a suspended truck-scale deck while crew members guide it
Positioning a truck-scale deck during installation.

How a project runs

From site review to first load.

  1. Site assessment

    We review what you weigh and the site it will sit on, then recommend a setup.

  2. Scope and quote

    Your quote identifies the equipment, installation work, customer responsibilities, and any outside trades required.

  3. Installation

    Delivery, setting and connection of the equipment, coordinated with the trades in the agreed scope.

  4. Startup and handoff

    The agreed startup checks, calibration, user training, and supplied documentation.

Site assessment

Questions we work through first.

These are planning questions. Some answers point to work by outside trades, which the quote spells out.

  • Loads you weigh, and how often
  • Vehicle movement around the scale
  • Available space
  • Power
  • Foundations and drainage
  • Network or data connections
  • Site access, induction and on-site contacts
  • Travel, freight and receiving equipment

Responsibilities

Who does what is in writing.

Your quote identifies the equipment, installation work, customer responsibilities, and any outside trades required. Foundations, lifting, electrical connections, network work, and approvals are coordinated as part of the agreed scope.

Startup and handoff cover the agreed startup checks, calibration, user training, and the documentation supplied with the equipment. State registration and inspection work is included only when it applies and is in the quoted scope.

A bush plane parked on a glacier surrounded by mountains

Remote sites

Planned around the trip.

Projects off the road system and far from Anchorage follow the same steps, planned around travel and freight lead times. Tell us about seasonal access, who receives the equipment, site induction, power availability, and your on-site contacts.

We review the project first, then agree whether a site visit is needed.

Planning a new system?

Tell us whether it's a new system, a relocation, or a replacement, and what you weigh.